BIM execution plan specific property names kişi be added on a per project basis. This allows to complete the BIM model in DigiPara Liftdesigner before it gets exported. Therefore, in elevators where the lift truck enters the cabin and unloads the load, the weight of the forklift is always included https://titusbrduc.bloggactif.com/34483877/elevator-the-backbone-of-modern-vertical-mobility